Posted in

Conservatives maintain months-long lead over Liberals, as Canadians’ economic anxiety rises: Nanos

The Conservatives are solidifying their lead over the Liberals, while Prime Minister Justin Trudeau and Conservative leader Pierre Poilievre are neck-and-neck for preferred prime minister, according to weekly tracking from Nanos Research.

The latest Nanos numbers show the Conservatives ahead of the Liberals with 33.1 per cent and 29.7 per cent respectively. The NDP are at 21.7 per cent.

I do not trust NANOS.

Share