
As claustrophobic congestion on Toronto’s Gardiner Expressway worsens with years-long lane closures to accommodate road repairs, Ontario’s minister of transportation is suggesting around-the-clock construction could dramatically shorten the time frame.
Parts of the Gardiner, between Dufferin Street and Strachan Avenue, have been reduced by one lane in each direction for “critical rehabilitation work” for three years.
Apparently the overflow has perma-clogged all alternate routes. Guess I won’t be going downtown for 3 years at least.
